- Completed Provider Mapping for Application Testing (Star, IDX, Rad Application Testing: tracking of CERT issues identified during application testing on CHS SharePoint, escalated issues to Medicity and assisted in researching issues in CERT environment and with CHS application teams, coordinated issues meeting with CHS teams & Medicity, logged issues in Medicity Rally defect tracking system.
- Assisted with getting CHS sign-off on Medicity Transcription Specifications
- Documentation: documentation of application testing issues, second draft of CHS Roadmap in PowerPoint, updated Application Test Status document.
- Project Management related reporting and correspondence with Medicity.
- Made site trip to review presentations from engine vendors, as part of process to help Inova migrate from DataGate.
- Wrote Perl script to create reports on HL7 transaction flow during week two of first round of integrated testing.
- Helped troubleshoot Cerner orders not making it over to GE PACS.
- Medmined PSJMC (1 hour) – Attended weekly status meeting for this project on Tuesday 12/14.
- Datanex PMMC/PUSMC (1 hour) – Attended weekly status meeting for this project on Tuesday 12/14.
- CPACS Vascular Reports (1 hour) – Attended weekly status meeting for this project on Wednesday 12/15.
- Escription PSJMC (1 hour) – Attended weekly status meeting for this project on Thursday 12/16.
- CPACS Vascular Reports Interface – Continued development of the new e*Gate collaboration rule class to support the new “vascular” report formats planned for implementation in February 2011. Continued the design and coding required to support the report formats that contain “tables”. Generally, the width of the tables needs to be reduced and this requires separate handlers for each report section to ensure that the table widths are reduced but no table data or headings are lost or truncated.
- Escription ADT/Reports interface – Generally supported work on both the ADT and Reports interfaces. Spent the majority of the time working through issues to be aware of for the reports interface including “CC” functionality via OBR.28 along with handling of the dictated and transcribed fields in the OBR segment.
- Medmined PSJMC RX interface (4 hours) – Worked to complete the production implementation for this interface on Wednesday 12/15 and to send notification emails to the interface team and the project team after the go live was complete.
- Wealth Engine FTP interface – Received request to initiate work on this new FTP interface for a Meditech extract for sending to the Wealth Engine application. Received vendor FTP specifications and provided response with proposed plan for this interface development and implementation.
- Datanex FTP interfaces – While reviewing the production e*Gate logs for these interfaces identified a weakness in the Java collaboration rule class code for handling multiple input files. Completed fix to the code to ensure that the e*Gate Batch e*Way for Java handles multiple input files properly and implemented the change in production.
|
|