|
Jul 31
2009
|
Healthcare Techincal Services Projects for July 09Posted by admin in Untagged |
|
- Mentored/Presented the Overall view of JCAPS Suite, along with each component that constitutes the project: eIndex, eXchange, eInsight, eBAM, eTL, eGate.
- Documented the Naming Convention that needs to be followed for the JCAPS components.
- Architected the JCAPS Flow.
- Architected the Exception Handling and Message Reprocessing mechanism for the JCAPS Implementation.
- Studied and Documented existing eGate Flowcast ADT Feed as Is.
- Studied and Documented existing eGateStar ADT Feed as Is.
- Studied and Documented eGate LIS Results (Lab, Micro, Path) Feeds As Is.
- Developing JCAPS- Flowcast ADT Inbound interface.
- Coded Filter / Router.
- Incorporated XML Schema.
- Coded CDR outbound.
- Created and tested prj_DISCH_TO_LOGICR project in test environment.
- Tested prj_FR_DISCH project in test env, this is a FTP feed ADTs.
- Create and tested prj_LABOR_TO_ALLSCRIPTS project in test environment.
- Sent old ADT missing data to DEXTER using HL7 Interface Explorer.
- Removed IBUFFER inbetween LWADT and CWS so that there wont be any more data missing.
- Test prj_LWADT_TO_CWS project in test environment.
- Performed new installation of eGate SRE 5.0.5 on AIX server.
- Successfully imported v4.5.3 schema into new 5.0.5 environment.
- Created documentation outlining steps of eGate Unix server installation.
- Created documentation on how to create and configure JMS Queue Manager and Queues.
- Created new JMS Queue to start conversion of standard IQ’s to JMS Queues.
- Updated server OS to latest maintenance release to resolve JMS Queue manager issues.
- Created links between production server and upgrade server for data comparison.
- Changed logging levels on eGate components to give client desired results.
- Performed data analysis between production and upgrade servers for upgrade validation.
- Signoff of MPI data Business owners Requirements by MPI Management Committee.
- Creation of Controlled Test Scenarios for MPI Backload data.
- Unit Testing of Scenarios for specific requirements for Sunrise Clinical Manager.
- Functional and Integrated testing of MPI Static Load Interfaces.
- Creation of Statistical throughput documentation incorporating all technical aspects of process
- Full MPI Backload Test analysis with remediation.
- Complete analysis of Test MPI Backload presented to MPI Management Committee.
- Full MPI Backload to Production with a less than .0005% Error rate of 9 million messages (3362 errors).
- Assisted Interface Management Team with realignment of staff to optimize skill sets.
- Attend CIO roundtable management meeting weekly.
- Creation of Dynamic Server Environment for dedicated development and testing of MPI Dynamic Load Process and Results Processing.
- Creation of Controlled Test Scenarios for MPI Dynamic data.
- Allocation of resources to expedite required tasks within multiple projects.
- Creation of multiple database environments (PRODCOPY2, PRODCOPY3, PRODMPI) for different staging events for Sunrise Clinical Manager.
- Unit testing of MPI Dynamic on DUG environment.
- Limited volume testing of MPI Dynamic combination of DUG/Test Environment Servers.
- Time analysis performed on MPI Dynamic results.
- Remediation testing for MPI Dynamic Interfaces.
- Unit testing of Radiology, Laboratory, Transcription Results process.
- Functional Testing using Controlled test Scenarios with Business Analysts.
- Expanded volume testing of MPI Dynamic Process.



Orchestrate Healthcare assessed our immediate issues and proposed a training solution that met our needs as well as worked within our budget