<?xml version="1.0" encoding="iso-8859-1"?>
<!-- generator="FeedCreator 1.7.2" -->
<rss version="2.0">
	<channel>
		<title>Blog Entries for admin</title>
		<description>A short description about your blog</description>
		<link>http://www.orchestratehealthcare.com</link>
		<lastBuildDate>Mon, 06 Sep 2010 10:17:26 +0100</lastBuildDate>
		<generator>FeedCreator 1.7.2</generator>
		<item>
			<title>Healthcare Technical Services Projects for Aug 22</title>
			<link>http://www.orchestratehealthcare.com/137-healthcare-technical-services-projects-for-aug-22.html</link>
			<description>&lt;br/&gt;	Conducted comparisons on projects in current Epic JCAPS Test environment to new Epic JCAPS Prod environment, and updated as needed&lt;br/&gt;	Continued testing and making modifications to Java Collaboration Definition in JCAPS 5.1.3 for Cpn results going to Epic&lt;br/&gt;	Performed analysis on data being sent from Professional Materials Management system intended to be sent to Epic&lt;br/&gt;	Modified Unix script file responsible for FTPing inventory data to Professional Materials Management system&lt;br/&gt;	Created new Proje [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 22 Aug 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for Aug 15 </title>
			<link>http://www.orchestratehealthcare.com/136-healthcare-technical-services-projects-for-aug-15.html</link>
			<description>&lt;br/&gt;	Powerscribe&amp;ndash; Completed e*Gate coding and unit testing to implement support via e*Gate ELS for the Meditech cancel order process that involves linking up a Meditech cancel order (CA) message with a Meditech order update (XO) message.&amp;nbsp; Copied and reused the e*Gate Event Link Sequencing (ELS) code that was previously implemented for the Meditech to PACS ORM interface.&lt;br/&gt;	&lt;br/&gt;	Powerscribe&amp;ndash; Supported interface message testing for the first Powerscribe patch installation.&amp;nbsp; Receiv [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 15 Aug 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for Aug 8 </title>
			<link>http://www.orchestratehealthcare.com/135-healthcare-technical-services-projects-for-aug-8.html</link>
			<description>&lt;br/&gt;	Assisted in strategic planning of moving current JCAPS 5.1.3 TEST installation to new hardware located at Disaster Recovery site&lt;br/&gt;	Provided input on outlined steps involved in moving JCAPS 5.1.3 TEST installation&lt;br/&gt;	Prepared and sent notification to ancillary systems of IP Address change on JCAPS 5.1.3 TEST&lt;br/&gt;	Modified environment Integration Servers and JMS IQ Manager properties to new server name&lt;br/&gt;	Corrected Domain.xml files for each domain to point at new localhost name&lt;br/&gt;	Assisted in adding  [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 08 Aug 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for July 18</title>
			<link>http://www.orchestratehealthcare.com/134-healthcare-technical-services-projects-for-july-18.html</link>
			<description>&lt;br/&gt;	&lt;u&gt;Cardiology&lt;/u&gt; &amp;ndash; Completed changes to the e*Gate data map changes and unit testing per the client conversion procedure/report/provider code changes that were previously provided.&amp;nbsp; (Excel spreadsheets).&amp;nbsp; &lt;br/&gt;	&lt;u&gt;Powerscribe&lt;/u&gt;&amp;nbsp; &amp;ndash; Successfully completed testing of Powerscribe to Meditech ORU/Report for report addendums.&amp;nbsp; First round of testing showed that an e*Gate coding change would be necessary to translate the value &amp;ldquo;C&amp;rdquo; to &amp;ldquo;A&amp;rdquo; for OB [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 18 Jul 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for July 11</title>
			<link>http://www.orchestratehealthcare.com/133-healthcare-technical-services-projects-for-july-11.html</link>
			<description>&lt;br/&gt;	&lt;u&gt;NPR Extract to MIDAS Abstracting&lt;/u&gt; &amp;ndash; Scheduled and held meeting (Tuesday 6/29) with the team to plan/schedule integrated testing for this interface.&amp;nbsp; Communicated steps to be completed prior to the integrated testing conference call and sent periodic status update emails in advance of call scheduled for Thursday 7/1.&lt;br/&gt;	&lt;u&gt;NPR Extract to MIDAS Abstracting&lt;/u&gt; &amp;ndash; Participated in integrated testing conference call with the team Thursday 7/1.&amp;nbsp; Successfully completed test [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 11 Jul 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for July 4</title>
			<link>http://www.orchestratehealthcare.com/132-healthcare-technical-services-projects-for-july-4.html</link>
			<description>&lt;br/&gt;	&lt;u&gt;NPR Extract to MIDAS Abstracting&lt;/u&gt; &amp;ndash; Worked to identify the proper way to handle the double quotation characters that wrap each of the data fields in the NPR Extract file.&amp;nbsp; We decided that it would be best to have e*Gate strip/remove the double quotation characters as part of the transformation code.&amp;nbsp; Implemented the e*Gate changes to strip/remove the characters and then tested the changes using the most recent test extract file.&lt;br/&gt;	&lt;u&gt;NPR Extract to MIDAS Abstracting&lt;/u&gt;  [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 04 Jul 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for June 27</title>
			<link>http://www.orchestratehealthcare.com/131-healthcare-technical-services-projects-for-june-27.html</link>
			<description>&lt;br/&gt;	&lt;u&gt;NPR Extract to MIDAS Abstracting&lt;/u&gt; &amp;ndash; Received first test NPR Extract file from our Client and completed a detailed review of the content.&amp;nbsp; Subsequently identified a series of changes that would be required to convert the NPR Extract&amp;rsquo;s date/time fields to the HL7 &amp;ldquo;TS&amp;rdquo; data type format.&amp;nbsp; Also identified the new 05 record type that was defined by our client to support CPT procedure code within the extract.&amp;nbsp; Completed changes for both date/time formatti [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 27 Jun 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for June 20 </title>
			<link>http://www.orchestratehealthcare.com/129-healthcare-technical-services-projects-for-june-20.html</link>
			<description>&lt;br/&gt;	NPR Extract to MIDAS Abstracting &amp;ndash; Participated in project kick-off meeting with the team to discuss the business needs and data requirements for this interface project.&amp;nbsp; Subsequently completed detailed analysis of the batch record specifications on the NPR Extract side and the BAR^P01 specifications and sample messages from the MIDAS side.&lt;br/&gt;	NPR Extract to MIDAS Abstracting &amp;ndash; Completed development and unit testing of the &amp;ldquo;inbound batch file reader&amp;rdquo; component of t [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Sun, 20 Jun 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for May 28 </title>
			<link>http://www.orchestratehealthcare.com/128-healthcare-technical-services-projects-for-may-28.html</link>
			<description>&lt;br/&gt;	Completed Interface Unit Testing and documentation for ancillary system Pyxis&lt;br/&gt;	Performed Interface Unit Testing between Epic and ancillary system RapidLink&lt;br/&gt;	Performed Interface Unit Testing between Epic and ancillary system RALS&lt;br/&gt;	Started development of ADT interface in JCAPS 5.1.3 for ancillary system MedQuist&lt;br/&gt;	Performed analysis on sample ORU message associated with new interface from ancillary system Witt&lt;br/&gt;	Developed Lab Results interface from ancillary system RapidLink to Epic in JCAPS [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 28 May 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for April 30</title>
			<link>http://www.orchestratehealthcare.com/122-healthcare-technical-services-projects-for-april-30.html</link>
			<description>&lt;br/&gt;	Continued ADT Unit testing and documenting results between Epic EMR and Witt ancillary system&lt;br/&gt;	Continued ADT Unit testing and documenting results between Epic EMR and Xim ancillary system&lt;br/&gt;	Continued ADT Unit testing and documenting results between Epic EMR and Integrated Health Record ancillary system&lt;br/&gt;	Continued ADT Unit testing and documenting results between Epic EMR and IntelliDesk ancillary system&lt;br/&gt;	Continued ADT Unit testing and documenting results between Epic EMR and Pyxis ancillary [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 30 Apr 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for April 23</title>
			<link>http://www.orchestratehealthcare.com/121-healthcare-technical-services-projects-for-april-23.html</link>
			<description>&lt;br/&gt;	Automate DataGate Documentation - Received Client&amp;rsquo;s requested fields for report.&amp;nbsp; Working on adding those to current script. &lt;br/&gt;	Research Daily Charge Reports &amp;ndash; Looking at automating reporting and validation based upon current script.&amp;nbsp; Waiting on distribution lists and direction. &lt;br/&gt;	Clean Up DataGate Test &amp;ndash; Continue working on cleaning up/archiving.&lt;br/&gt;	Clean Up DataGate Production &amp;ndash; Coordinated scheduling with client.&lt;br/&gt;	GE/IDX Charges to HealthQuest comm. clien [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 23 Apr 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for April 16</title>
			<link>http://www.orchestratehealthcare.com/119-healthcare-technical-services-projects-for-april-16.html</link>
			<description>&lt;br/&gt;	Gathered communication specifications for external target systems.&lt;br/&gt;	Tested ADT for EPIC system.&lt;br/&gt;	Patient Registered, Updated,Transfered and discharged to trigger events A04,A08,A02,A03.&lt;br/&gt;	Performed unit testing for Cerner Radnet, PMM &amp;amp; PACS systems.&lt;br/&gt;	Coordinated with Unit testing for Unit testing.&lt;br/&gt;	Re-organized the JCD code to make it simple &amp;amp; understandable.&lt;br/&gt;	Configured IP &amp;amp; Port numbers in JCAPS for Receiving systems PACS, Cerner Radnet &amp;amp; PMM. &lt;br/&gt;	Performed analysis on O [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 16 Apr 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for April 09</title>
			<link>http://www.orchestratehealthcare.com/116-healthcare-technical-services-projects-for-april-09-116.html</link>
			<description>&lt;br/&gt;	Created new Project in JCAPS 5.1.3 to process Epic order messages to RapidLink ancillary system&lt;br/&gt;	Created new Connectivity Map for the RapidLink ancillary system and configured with needed components in JCAPS 5.1.3&lt;br/&gt;	Created, validated, and compiled new Java Collaboration Definition for the RapidLink ancillary system in JCAPS 5.1.3&lt;br/&gt;	Created new HL7 TCPIP External System for the RapidLink ancillary system under designated domain in JCAPS 5.1.3&lt;br/&gt;	Created and configured new Deployment Profile f [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 09 Apr 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for April 02</title>
			<link>http://www.orchestratehealthcare.com/108-healthcare-technical-services-projects-for-april-02.html</link>
			<description>&lt;br/&gt;	Gathered data requirements from ESI, HMS(RODs), Safety Surveillor.&lt;br/&gt;	Configured Epic Inbound/Outbound eway to get/put the HL7 messages from/to Epic.&lt;br/&gt;	Went through existing interface logic for filtering criteria and to understand existing logic.&lt;br/&gt;	Prepared the Analysis document from the existing interface.&lt;br/&gt;	Developed OTD's for ADT/Orders interface data to get from/send to Epic.&lt;br/&gt;	Configured HL7 Tcpip eway to send data to and from Epic, ESI, Safety Surveillor, HMS(RODs) system.&lt;br/&gt;	Developed In [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 02 Apr 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for March 26</title>
			<link>http://www.orchestratehealthcare.com/107-healthcare-technical-services-projects-for-march-26.html</link>
			<description>&lt;br/&gt;	Created new Project in JCAPS 5.1.3 to process CareCast order messages to Pinestar ancillary system&lt;br/&gt;	Created new Connectivity Map for Orders to Pinestar and configured with needed components in JCAPS 5.1.3&lt;br/&gt;	Created, validated, and compiled new Java Collaboration Definition Orders to Pinestar in JCAPS 5.1.3&lt;br/&gt;	Created new HL7 TCPIP External System for Orders to Pinestar under designated domain in JCAPS 5.1.3&lt;br/&gt;	Created and configured new Deployment Profile for Orders to Pinestar in JCAPS 5.1.3&lt;br/&gt; [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 26 Mar 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for March 19 </title>
			<link>http://www.orchestratehealthcare.com/106-healthcare-technical-services-projects-for-march-19.html</link>
			<description>&lt;br/&gt;	Developing Flowcast Schedule Interface to EPIC Using JCAPS&lt;br/&gt;	Developing Monitor to Monitor for the runtime components of Jcaps Environment&lt;br/&gt;	Developing AS OB Results Interface to CDR Using JCAPS.&lt;br/&gt;	Changed PMM mapping based on mapping document changes and discussions.&lt;br/&gt;	PMM(the message type is :MFN) connectivity testing done between PMM and EPic.&lt;br/&gt;	Performing Unit testing between Epic and Radnet with ADT messages.&lt;br/&gt;	Performed Connectivity testing between Epic and HDM.&lt;br/&gt;	Documented the ADT int [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 19 Mar 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for March 12 </title>
			<link>http://www.orchestratehealthcare.com/103-healthcare-technical-services-projects-for-march-12.html</link>
			<description>&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;	Modifications and Enhancements made to&lt;br/&gt;	client websites using Dreamweaver software.&lt;br/&gt;	Technical input provided to client for&lt;br/&gt;	completion of their request for Information document (RFI).&lt;br/&gt;	Created new Project in JCAPS 5.1.3 to&lt;br/&gt;	process Epic ADT messages to Individual Health Record ancillary system&lt;br/&gt;	Created new Connectivity Map for&lt;br/&gt;	processing ADT to IHR system and configured with needed components in JCAPS&lt;br/&gt;	5.1.3&lt;br/&gt;	Created, validated, and compiled new&lt;br/&gt;	Java Collaboration Definit [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 12 Mar 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for March 05</title>
			<link>http://www.orchestratehealthcare.com/102-healthcare-technical-services-projects-for-march-05.html</link>
			<description>&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;	Created new Project in JCAPS 5.1.3 to&lt;br/&gt;	process Master File messages for providers to the&amp;nbsp;ancillary systems&lt;br/&gt;	Created new Connectivity Map for&lt;br/&gt;	processing Master Files and configured with needed components in JCAPS 5.1.3&lt;br/&gt;	Created and configured new Deployment&lt;br/&gt;	Profile for processing Master Files in JCAPS 5.1.3&lt;br/&gt;	Performed build and deploy on&lt;br/&gt;	Deployment Profile for processing Master Files in JCAPS 5.1.3&lt;br/&gt;	Created new custom Object Type&lt;br/&gt;	Definition to be used as a template fo [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 05 Mar 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for Feb 26 </title>
			<link>http://www.orchestratehealthcare.com/101-healthcare-technical-services-projects-for-feb-26.html</link>
			<description>&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;	Completed a review/revise of the e*Gate production implementation plan&lt;br/&gt;	for client after receiving some great feedback from review team regarding the&lt;br/&gt;	initial draft.&lt;br/&gt;	Completed build of the client e*Gate interface modules in PROD on&lt;br/&gt;	Thursday night 2/25.&amp;nbsp; Completed initial&lt;br/&gt;	test of connectivity prior to starting the modules.&amp;nbsp; Completed the final ADT backload as part of&lt;br/&gt;	the production implementation steps prior to the cutover to the live ADT feed.&lt;u&gt;&lt;/u&gt;&lt;br/&gt;	Completed su [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 26 Feb 2010 17:00:00 +0100</pubDate>
		</item>
		<item>
			<title>Healthcare Technical Services Projects for Feb 19 </title>
			<link>http://www.orchestratehealthcare.com/100-healthcare-technical-services-projects-for-feb-19.html</link>
			<description>&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;&lt;br/&gt;	Modified Java Collaboration Definition&lt;br/&gt;	&amp;nbsp;to extract email addresses from file on&lt;br/&gt;	server instead of them being hardcoded.&lt;br/&gt;	Modified, validated, and compiled Java&lt;br/&gt;	Collaboration Definition for EPIC ADT in JCAPS 5.1.3&lt;br/&gt;	Performed build and deploy on&lt;br/&gt;	Deployment Profile EPIC ADT JCAPS 5.1.3&lt;br/&gt;	Created new Project From Epic to MedAptus&lt;br/&gt;	in JCAPS 5.1.3 to process Epic ADT messages to MedAptus ancillary system&lt;br/&gt;	Created new Connectivity Map From Epic&lt;br/&gt;	to MedAptus and configured w [...]</description>
			<author>daniel@ninjoomla.com</author>
			<pubDate>Fri, 19 Feb 2010 17:00:00 +0100</pubDate>
		</item>
	</channel>
</rss>