Aug 29
2011
|
Healthcare Technical Services Projects for August 28Posted by admin in Untagged |
|
- Vrad to Mckesson Star Go-Live
- Integration and Vrad Team meeting
- Javascript to filter Chest Xrays for NICU patients
- In progress Route Design FTP log/DB logger to capture Financial transaction between Meditech/Lawson/LSS
- Designing SQL query to handle file properties and build email notifications
- Integration Team Project Planning meeting
- Created javascript to provide a flatfile to HL7 batched msg count
- Created javascript to check Meditech flat file data for current date
- Mentor Integration team on Rhapsody best practices
- Am overseeing the coordination of the different build groups so all builds contain he proper information required
- Reviewed all tests for inactive vs active status—set up a master spread sheet for all 1600 procedure codes
- 41 legacy codes need to be added to the system for the legacy conversion
- 32 codes need to be added to the orders build
- Several dozen need to be updated for the EPIC Cadence – outpatient portion
- Have Phase 2 codes identified to go in by Oct 15th
- In the process of analyzing all 1866 charge to reconcile with the 513 billing think they need.
- Set up a master comparison spreadshseet for this item
- Testing some new workflows being introduced which are causing some non- expected behavior
- Conducted cross system merge testing with ePI, documenting findings.
- Participated in initial ADT testing with Eclipsys RIS.
- High Level Overview of RSA KBA Project, the purpose of the project including the players and their roles. There are three goal dates for the project, 10/01/11 – Original Date Internal Roll Out, 11/01/11- Modified Internal Roll Out Based on Six week timeline, 01/01/12 – Roll out to entire community.
- Review initial database and software requirements as well as system access needs for the RSA KBA Project.
- Get more detailed requirements for the project and document in a specification.
- Completed build, unit testing and integrated testing for ADT Bridge e*Way’s in the e*Gate “CONV” environment schemas based on the design that was approved last week. I had to create one in the CS schema and one in the CS_Southern schema.
- Began build of LAB Results Bridge e*Way in the e*Gate “CONV” environment’s “EICU” schema based on the design that was approved last week.
- Completed build, unit testing and integrated testing of LAB Results Bridge e*Way in the e*Gate “CONV” environment’s “EICU” schema based on the approved design.
- Completed build, unit testing and integrated testing of ITS Results Bridge e*Way in the e*Gate “CONV” environment’s “PACS” schema based on the approved design.
- Completed changes necessary to reorganize the schema from 1 control broker to 4 control brokers including _ADT for ADT message processing for all ministries, _LAB for LAB results message processing for all ministries, _ITS for Radiology and Transcription report message processing for all ministries and finally _Backload_TA which is a temporary control broker that will house all of the File e*Ways required to support the up front data backload for data types and ministries. These changes included the creation of new JMS IQ Managers in the _ADT, _LAB and _ITS schemas along with new JMS e*Way Connections for each new JMS IQ Manager followed by the configuration changes necessary to ensure that the new JMS e*Way Connections are used for all schema collaboration publications and subscriptions.
- Completed build, unit testing and integrated testing of the RTR BOB for ITS reports that will be used to split ITS reports out into two event types (one for RAD Radiology reports and one for TRA Transcription reports) based on the value of OBR.20 (Report Department) prior to processing by two separate TRX BOBs. Completed build, unit testing and integrated testing of the RAD and TRA TRX BOBs in order to isolate separate placeholders for future transformation business rules for RAD Radiology reports and TRA Transcription reports.
- Completed extensive set of message volume tests using production data archives for all data types and all ministries. This volume test was from end to end test moving data from the target schemas in the “CONV” environment (CS, CS_Southern, EICU and PACS) through the schema bridges to the schema all the way through the standardized set of RTR and TRX BOB’s that were previously built in the schema for handling the currently lightweight routing and transformation required for the data feeds. An additional volume test was also executed using the File e*Ways instead of the schema bridges as input mechanisms in order to ensure that that path produces the same set of results as the tests that used the schema bridges as the input mechanism.
- Completed production implementation of the changes to expand the Project ADT interfaces including a new Outbound HL7 TCP/IP e*Way that sends ADT messages for all 3 ministries outbound to Project on a single port. Subsequently, completed build/updates for the Project e*Gate components in the “CONV” schemas in order to ensure that production and test are synchronized.
- Per issue reported, completed re-send of ADT messages that had to be deleted from the queue when the interface was down for 3 days over the weekend because Project support both on the client side and on the Project side were extremely slow to respond to a lost/dropped TCP/IP connection from e*Gate to the Server.