Healthcare Technical Services Projects for April 09Posted by admin in Untagged |
|
- Created new Project in JCAPS 5.1.3 to process Epic order messages to RapidLink ancillary system
- Created new Connectivity Map for the RapidLink ancillary system and configured with needed components in JCAPS 5.1.3
- Created, validated, and compiled new Java Collaboration Definition for the RapidLink ancillary system in JCAPS 5.1.3
- Created new HL7 TCPIP External System for the RapidLink ancillary system under designated domain in JCAPS 5.1.3
- Created and configured new Deployment Profile for the RapidLink ancillary system in JCAPS 5.1.3
- Performed build and deploy on Deployment Profile for the RapidLink ancillary system in JCAPS 5.1.3
- Made modification to Java Collaboration Definition jcdHL7Inbound and performed build and deploy all projects that use it
- Performed ADT unit testing between Epic and Dexter ancillary system
- Performed ADT unit testing between Epic and Clinical Work Station ancillary system
- Performed troubleshooting analysis and made modifications to Java Collaboration Definition on the Epic ADT to CWS project
- Performed ADT unit testing between Epic and Midas ancillary system
- Created Unit Testing Toolkits to be used during ADT unit testing with ancillary systems
- Made modifications to Object Type Definition otdKhnAdt to accommodate the use of ZIN segment
- Performed validation on Java Collaboration Definition jcdOutCCAdtCws0 after making modifications to otdKhnAdt and made appropriate changes
- Analysis of Intersystems Ensemble Specifications.
- Conference call with Knowledge transfer to client in using SalesForce web services for Eligibility integration. Follow up, by reviewing SalesForce API documentation and generating recommendation regarding engine to use. Assemble initial workflow documentation. Creation and detail introduction for Eligibility flow diagram.
- Generate write-up of our Meaningful Use capabilities.
- Analysis of SYNAPPS product documentation.
- Transolutions PCMC – Attended weekly status conference call. Worked with client to identify a list of test patients that I would admit/register in the Meditech test system in advance of integrated testing schedule. Completed the registration of the 3 test patients, updated the test plan spreadsheet with the test patient information, consolidated Barb’s updates to the test plan spreadsheet and emailed the finalized test plan to the vendor from Transolutions.
- Completed 50% of the e*Gate coding for the ORM^O01 to ADT^A08 translation piece of the partial orders solutions for the client after finalizing the format of the combined accession/procedure data field. Later in the week, received word from the client that an alternate “workflow” based solution had just been proposed and accepted which solves the orders based reports problem. Therefore, I stopped working on the translation piece with approval of the client.
- Attended weekly status conference call. Worked with client at separate site to identify a list of test patient types that I would admit/register in the Meditech test system in advance of integrated testing. Completed the registration of the 7 test patients and shared the list of test patient information with client admissions. Client then updated the test plan spreadsheet and emailed the finalized test plan to Debbie from Transolutions.
- Participated in 3-hour integrated testing session with the Transolutions team. The entire test plan was executed and no issues were detected that would require e*Gate interface code changes. One issue was detected regarding the “default/generic” transcriptionist mnemonic which was not yet defined for the client test system. Subsequently sent a detailed email describing the issue with a suggestion to standardize to “TRANSOL” for all current and future Transolutions implementations and to also eliminate the “warning” messages that are generated for each report currently filed via the Meditech inbound ITS interface.
- Worked with client contact after integrated testing to test his code change solution for the warning that is currently reported by the e*Gate HL7 e*Way’s that deliver ADT messages to Transolutions for each of the current live sites. The warning “message ACK MSA segment not terminated with carriage return” was first reproduced, then client contact implemented his change, another test was run and the warning message was not recorded, problem solved. Will work with the client contact and the Integration team this week to propose a date for implementing the change.
- Attended interface discussion/planning conference call. This meeting focused on the Powerscribe Reports to Meditech interface. Identified the requirement to transform multiple ORC/OBR pairs from Powerscribe into single ORC/OBR pair. Also, requested that Powerscribe send report lines as repetitions within a single OBX segment instead of sending each report line in separate OBX segments.
- Allscripts – Pulled production messages and pushed them through the TEST environment in order to generate the raw data in the e*Gate log file for the “Message Sent/Not Sent” Report. Generated an Excel spreadsheet from the raw data and emailed the resulting spreadsheet to the client for his review and possible feedback / request for changes.
- Performed audit of eGate TRE system including Test and Production environments.
- Created automated audit reports of eGate TRE port and routing information in csv format which are emailed to analysts on a regular basis.
- Created automated issue reports of eGate TRE orphan files that are not used in the environment – identification files (.isc), translation files (.tsc) and configurations (*.cfgs/*.sc). These csv reports are emailed to analysts on a regular basis.